GKR's Requirements
Due to heat rising upwards, the mezzanine floor becomes very warm and uncomfortable for the staff working in the open-plan office space in the summer months.

The Solution

Considering the working environment and that most of the work taking place on the upper mezzanine floor is office-based tasks; we ruled out the introduction of an evaporative cooling system to cool the area as noise from the coolers and supporting extraction fans would be an unwelcome distraction for the office-based staff.
Instead, we chose to install a high-efficiency Mitsubishi high static ducted system that will provide the layout of the mezzanine floor with a more effective and even spread of cooling (and heating in the winter months) as opposed to a standard split system that is more favourable in office space with standard ceiling heights.
The Results
The air conditioning system was fully installed to schedule, and a time to suit the customer so it didn’t interfere with the customer’s stock-taking plans.
The morning following the completed installation, the customer commented to OKEL on how much of a difference the new air conditioning units were making and how impressed the customer was with the installation and tidiness of the team carrying out the installation.
Get in touch with OKEL in the form below if you would like us help you source a more efficient factory heating solution.